Saturday, July 31, 2010
End of the month update
Yes, I've been knitting. I even have some photos, but they are still on the camera. Maybe tomorrow I can post details. But, yes, I'm still here, still knitting and when not knitting, just plain busy. Heading out of town in a few minutes with a van full of kinfolk. :-}
Monday, July 5, 2010
July 2010 Socks
Finished this pair this morning and mailed them off to Colorado already. I remembered to include the ball band in the parcel, but forgot to make note of the color #.Pattern: My own. Top down. CO 68 sts. with a ribbed leg (and upper foot) that includes a 4 st. cable down the center of both front & back. I adjusted the socks on the blockers to show the cable. (Enlarge to see)
Yarn: OPAL Cotton. #2092, I think. It's white and shades of denim.
Needles: 1[US] 2.25mm; two circs
Knit for: My DS in Colorado
Subscribe to:
Posts (Atom)